Jan
2002 - Still Moving Forward
Following
on from our previous Newsletters "G PILE, the quiet, non-vibratory
and environmentally friendly piling system has steadily gained
acceptance in the building & construction industry.
From
our first project in Adelaide in 1998 we have seen a steady increase
in both enquiries (Australia & overseas) and successful projects
all over Australia. Australasian Piling Company (A.P.C.) has continued
its marketing strategy and has achieved steady growth and at this
time both the YZY600 & the YZY120 machines are busy carrying
out projects.
THE
YZY600T PILING RIG:
At
the present time this machine is installing piles 350mm, 400mm
and 450mm square up to 36metres deep for MULTIPLEX (the builders),
& OVE ARUP (the structural engineers), at the new PERTH CONVENTION
& EXHIBITION BUILDING PROJECT.
The largest construction project in Perth.
There have been many comments on the quietness of the machine,
the premier of Western Australia came to the site and commented
on this very aspect. The continuous favourable comments regarding
the quietness of the machine and the lack of vibration is very
pleasing. The Premier of Western Australia attended the site and
commented on this very aspect of the machine.
THE
YZY120T and Y2Y600 PILING RIGS:
These
machines have been extremely busy over the last 5 years and
at the present is preparing to commence Piling at the new Gold
Cost Convention Centre. This machine has only recently completed
a project in Melbourne for a multi storey apartment building.
It has installed various pile types including Precast concrete,
Steel & Timber.
The
YZY120T PILING RIG
has carried out projects in Sydney (3), Wollongong N.S.W. (1),
Mannum S.A. (1), Glenelg S.A. (5), Melbourne Vic, (2), Westlakes
S.A. (1), QLD (2).
Should
you have any queries regarding our Piling systems please feel
free to call.
Australasian
Piling Company and it's consulting engineers URS Australia are providing piling design solutions to take advantage of its
unique technology and to save their clients dollars.
BENEFITS
OF THE "G"PILE:
-
NO NOISE,
NO VIBRATION, EPA COMPLIANT.
-
EVERY PILE "STATIC" LOAD TESTED TO ULTIMATE LOAD -
NO OTHER TESTING REQUIRED
-
NO SPOIL TO REMOVE FROM SITE. REMOVES RISK OF HANDLING CONTAMINATED
GROUND.
-
ALL REDESIGN AND INDEPENDENT ENGINEERS CERTIFICATION
COSTS INCLUDED IN OUR QUOTATIONS.
-
COMPETITIVE QUOTES, GENERALLY WITH COST SAVINGS.
-
OCCUPATIONAL HEALTH, SAFETY & WELFARE, NO LOSS OF HEARING
CLAIMS
-
NO COMPLAINTS OR COURT INJUNCTIONS FROM "NEIGHBOURS"
DUE TO CONSTANT NOISE.
NO COMPLAINTS OR COURT INJUNCTIONS FROM "NEIGHBOURS"
DUE TO CONSTANT NOISE.